|
This roof was divided into many sections particular attention was given to the drain area. All drains had new copper drain tubes installed. This flat roof consisted of old torched down unpainted modified asphalt membrane, old 3 ply hot tar roof and numerous sections of worn out 90 lb. capsheet. A new modified asphalt cold applied system was installed. This roof is now leak free.
|