We removed gravel which was from the original roof installation by use of vacuum truck set up alongside building. We then installed an organic base sheet and a new Firestone SBS white granulated modified asphalt membrane roofing system. This roof was completed in 7 working days. Cranes were utilized to get roofing material on roof utilizing crane did not interfere with the tenants in the building.
|